CASE HISTORY PROJECT SUMMARY

PROBLEM: Incorporate heat recovery into seven (7) new air handlers being provided for this building.

SOLUTION: Carolina Heat Pipe, Inc. provided and installed a Thermospyphon Run Around Heat Pipe (TRAHP™) system for seven (7) air handlers (15,000 to 27,000) with approximately 5,600 to 9,100 CFM outside and relief air. Seven (7) six-row controllable energy recovery TRAHP™ heat exchangers systems fit within seven (7) HAAKON air handlers. CHP provided the air handler manufacturer with coil assemblies for placement in their air handlers. After the air handlers were delivered to the job site, CHP completed the TRAHP™ installation.

RESULTS: Annual gas energy saved: 83,633 Therms
PAYBACK PERIOD: 1.4 years
RETURN ON INVESTMENT (ROI): 71.2%


Other CHP Dehumidification Solutions

Back to Solutions