CASE HISTORY PROJECT SUMMARY

PROBLEM: To recover energy lost from Building 362 exhaust.

SOLUTION: Carolina Heat Pipe provided their Split System Heat Recovery Thermosyphon Run Around Heat Pipe (TRAHP™) System. The Installation consists of two (2) 4 row roof TRAHP™ coils separated by 8.5 feet. The exhaust energy was passively transferred to the supply air using single insulated vapor and liquid refrigerant lines.

RESULTS: This passive energy efficient system reduced the energy load.
PAYBACK PERIOD: 1.6 years
RETURN ON INVESTMENT (ROI): 64.4%


Other CHP Energy Recovery Solutions

Back to Solutions