CASE HISTORY PROJECT SUMMARY

PROBLEM: Attaining the highest standards for energy use and sustainability, in the Norwegian climate.

SOLUTION: Carolina Heat Pipe, Inc. provided and installed two passive and reversible spilt energy recovery Thermosyphon Run Around Heat Pipe (TRAHP™) Systems.

RESULTS: The CHP split system energy recovery systems are expected to recover up to 429,300 BTU per hour at design conditions.


Other CHP Energy Recovery Solutions

Back to Solutions