CASE HISTORY PROJECT SUMMARY

PROBLEM: Provide energy recovery in a new Bio Science Laboratory.

SOLUTION: Carolina Heat Pipe, Inc. provided and installed a six (6) row split system heat recovery Thermosyphon Run Around Heat Pipe (TRAHP™) system from a 34,000 CFM exhaust unit and transferred to the supply of a 30,000 CFM air handler.

RESULTS: Cooling load was reduced by 60,532 Therms per year.
PAYBACK PERIOD: 0.8 years
RETURN ON INVESTMENT (ROI): 121.8%


Other CHP Energy Recovery Solutions

Back to Solutions