US Naval Air Station, Building 362

US Naval Air Station, Building 362

US Naval Air Station, Building 362 

Installation of Split System Heat Recovery TRAHP® thermosyphon run around heat pipe system, resulted in 1.6 year payback.  

For Information about the product, click here 

For a PDF copy of this case study, click here