US Naval Air Station, Building 362
US Naval Air Station, Building 362
Installation of Split System Heat Recovery TRAHP® thermosyphon run around heat pipe system, resulted in 1.6 year payback.

US Naval Air Station, Building 362
Installation of Split System Heat Recovery TRAHP® thermosyphon run around heat pipe system, resulted in 1.6 year payback.
